menu
menu
Menu
Short Answer
Lifetime Impact may be shown as a range because the potential contribution associated with different donation types can vary.
Detailed Explanation
The current BDOI® methodology assigns ranges to several donation types. For example, platelet donation contributes 1–4 points, while plasma contributes 1–2 points and whole blood contributes 1–3 points.
Because donation types can have different contribution ranges, a lifetime impact representation may also be expressed as a range rather than a single exact figure.
Key Points
A range does not reduce your impact—it honestly represents the many ways a donation can help.